The National Electrification Administration (NEA) is the government agency mandated to oversee, supervise, and support the country’s electric cooperatives (ECs), which play a crucial role in providing electricity to households, businesses, and communities, particularly in rural areas.

As part of its oversight function, NEA evaluates ECs using 14 indicators covering seven key financial and technical standards. These include working capital, collection efficiency, payment obligations, financial performance, net worth, feeder losses, and power reliability.

Based on their compliance, ECs are classified into four categories: Green for those meeting all seven standards; Yellow for those meeting four to six; and Orange for those meeting only one to three. Red is reserved for cooperatives considered “ailing” under the NEA Reform Act of 2013 (RA 10531).

These ratings provide a basis for determining how well cooperatives are managed, identifying areas that need improvement, and guiding NEA’s monitoring, technical assistance, and possible interventions.

(Also read: Davao City Turns Mounting Garbage Problem Into A Power Opportunity)

NEA’s Latest Scorecard

The NEA’s second-quarter report points to a deteriorating picture across the cooperative sector. Of the 120 ECs assessed, 31—or roughly one in four—received lower classifications than they did in the same quarter of 2025.

Most of the downgrades involved cooperatives falling from Green to Yellow, with 25 ECs making that shift. Four others slipped from Yellow to Orange, while Lanao del Norte Electric Cooperative (LANECO) dropped two levels, from Green to Orange.

The Northern Davao Electric Cooperative (NORDECO) was among those downgraded to Orange. It also posted the lowest energization rate among the three ECs in the Davao Region at 79.68%. Additionally, data from the Independent Electricity Market Operator of the Philippines (IEMOP) showed that NORDECO had accumulated ₱1.2 billion in unpaid energy settlement obligations as of October 30, 2026, the highest among ECs nationwide.

Zamboanga del Sur Electric Cooperative 2 (ZAMSURECO 2) suffered an even steeper setback, falling from Orange to Red. This brought the number of cooperatives in the lowest, ailing category to eight, up from the previous year.

Manila Times columnist Ben Kritz pointed out that the NEA’s second-quarter assessment reflected a marked decline within just three months. The number of Green cooperatives fell from 55 in the first quarter to 46 in the second, while Yellow increased from 50 to 56 and Orange from seven to 10. The shift marked a steeper decline than the sector had experienced in any full year.

While the sector’s weaker performance may partly be due to the global energy crisis, Kritz argued that external pressures should not excuse ECs from falling short of basic financial and operational standards.

“The NEA standards leave much to be desired as it is; it does not capture customer service performance in any sense, which has been made abundantly clear by the number of complaints and the near-revolt of customers in favor of private distribution utilities among some ECs (such as the two in Batangas) that are purportedly performing well according to the NEA’s scale,” he wrote.

Green Ratings, Lingering Red Flags

The Partners for Affordable and Reliable Energy (PARE) has urged NEA to revisit its performance evaluation system ECs, arguing that higher ratings do not necessarily translate into more reliable or affordable electricity for consumers. PARE Chief Advocate Officer Nic Satur Jr. acknowledged the improvements made by some cooperatives but stressed that their ratings should also reflect the quality of service delivered.

“While the National Electrification Administration (NEA) reports improvements, consumers continue to suffer from frequent scheduled and unscheduled power interruptions and face rate adjustments that affect our household budgets,” he wrote.

PARE also believes that the number of underperforming cooperatives could be higher if consumer experience were given greater weight in NEA’s assessment.

Here are some ECs that received Green ratings despite questions about their overall performance:

Batangas Electric Cooperative (BATELEC) II

In March 2026, almost 2,000 residents and business owners in Laiya, Batangas, petitioned for Meralco to take over power distribution, citing frequent outages, damaged appliances, and disappointing customer service under BATELEC II II. The appeal followed a November 2025 endorsement by a local business and civic group of a proposed Meralco-BATELEC II joint venture, which it said could address recurring disruptions and their impact on businesses and provincial development.

Aklan Electric Cooperative (AKELCO)

In September 2026, the Aklan Provincial Board conducted a legislative inquiry into recurring power interruptions across the province. The Board said supply shortages had forced AKELCO to resort to manual load dropping and rotational brownouts. However, this highlighted the EC’s vulnerability to supply disruptions. The cooperative was also purchasing electricity from the Wholesale Electricity Spot Market (WESM) to supplement its contracted supply, contributing to higher consumer bills.

Tarlac Electric Cooperative (TARELCO) I

TARELCO I faced consumer and regulatory complaints over billing and property use. In August 2026, a Victoria resident questioned a ₱1.13-million electricity bill, far above the household’s usual ₱3,500 monthly charge, alleging a meter-reading error. Separately, a complaint before the Energy Regulatory Commission (ERC) accused the cooperative of placing poles, lines, and other facilities on private properties without proper consent, seeking relocation, easement payments, and sanctions.

Busuanga Island Electric Cooperative (BISELCO)

Consumers in Coron and Busuanga questioned steep electricity bill increases, with some charges reportedly nearly tripling. During a June 9 provincial board session, a local airport stall was cited as having received an ₱18,000 bill, up from its usual ₱5,000. BISELCO attributed higher summer bills to increased consumption that pushed some users beyond subsidized-rate thresholds. Additionally, the ERC penalized BISELCO for fuel-audit and generation-charge compliance violations.

Sultan Kudarat Electric Cooperative (SUKELCO)

SUKELCO’s service reliability has come under scrutiny following a series of power disruptions in 2026. The cooperative recorded temporary outages during the September 14 Bangsamoro Autonomous Region in Muslim Mindanao (BARMM) parliamentary elections and declared a total interruption in June after a magnitude 7.8 earthquake struck off Sarangani. The latter affected over 800,000 consumer connections across Mindanao, prompting NEA to mobilize additional personnel and equipment.

(Also read: From Power Surplus to Looming Shortfall: Mindanao Faces a Critical 2028)

Ratings Should Reflect Consumers’ Realities

The controversies surrounding ECs underscore the need to rethink how their performance is measured and how they are held accountable. While improvements in financial and administrative management deserve recognition, these achievements should not outweigh the quality of service delivered to member-consumer-owners. After all, electricity is an essential service, and consumers should not have to endure expensive rates, frequent outages, and unresolved complaints while their cooperatives maintain favorable performance ratings.

The Power for People Coalition (P4P) and its consumer allies, including PARE, are right to call on the NEA to revisit its seven evaluation parameters and give greater weight to affordability, outage frequency and duration, and complaint resolution. As PARE pointed out, the agency must also account for the assistance it provided to 31 ECs whose classifications declined between the second quarters of 2025 and 2026. If these interventions failed to produce meaningful improvements, the public deserves to know why.

More importantly, NEA should require each underperforming cooperative to publish a recovery plan with clear deadlines, measurable targets, and regular progress reports. Such transparency should be a basic expectation of institutions that operate under a system of public ownership and are entrusted with delivering an essential service.

Ultimately, an EC’s ratings must reflect what consumers actually experience: whether electricity is affordable, reliable, and restored promptly when disruptions occur. Public ownership should mean public accountability, not protection from scrutiny. NEA must ensure that its evaluation system measures not merely how well cooperatives manage their operations, but how effectively they serve the communities they were established to support.

Sources:

https://elibrary.judiciary.gov.ph/thebookshelf/showdocs/10/76089

https://naro.law.upd.edu.ph/storage/01JN5QXJDX4KWNDXB3NNJTNXKF.pdf

https://nea.gov.ph/wp-content/uploads/2025/09/NEA-2024-Annual-Report_compressed.pdf

https://www.manilatimes.net/2026/11/17/opinion/columns/electric-co-ops-continue-to-fare-badly/2470816

https://www.sunstar.com.ph/davao/nordeco-downgraded-to-orange-status

https://businessmirror.com.ph/2026/11/11/davao-electric-cooperative-asked-to-account-p1-2-b-debt-from-wesm

https://www.facebook.com/story.php?story_fbid=1084682237905304&id=100090906142216&mibextid=wwXIfr&rdid=acpItQRNqesrbnez#

https://newsinfo.inquirer.net/2189771/https-newsinfo-inquirer-net-2189771-fwd-batangas-coop-quizzed-about-delay-action-on-meralco-jva-proposal

https://tribune.net.ph/2026/03/24/batangas-residents-seek-meralco-entry-amid-power-woes

https://kalibo.bomboradyo.com/kakueangan-sa-supply-it-kuryente-sa-visayas-grid-rason-it-rotational-black-out-sa-aklan

https://tribune.net.ph/2026/08/03/bill-ng-kuryente-tumataginting-na-p1-milyon

https://erc.gov.ph/Files/Render/issuance/49762

https://palawan-news.com/provincial-board-seeks-answers-on-soaring-power-bills-in-coron-busuanga

https://erc.gov.ph/Files/Render/issuance/45658

https://iselco2.com.ph/nea-the-national-electrification-administration-nea-is-closely-monitoring-the-power-situation-of-electric-cooperatives-ecs-operating-within-the-bangsamoro-autonomous-region-in-muslim-mindanao-ba